Project Name: I-5 Crossing at Seattle Ave SW and Pacific Highway Water Main Replacement Project

Job No.: 0576
Work Order No.: 20895
District Project Manager: Craig Gibson
Engineer: CHS Engineers, LLC
Engineer’s Estimate: $1,265,000 including sales tax

Work to be performed includes:
•Furnishing and installing approximately 1,750 linear feet of 16-inch diameter ductile iron and approximately 75 linear feet of 12-inch diameter ductile iron water main.
•Remove existing 18-inch diameter concrete sewer pipe, existing casing supports, end blocking and sand/debris from inside existing casing under I-5.
•Bypass of the existing sewer between SSMH 3850 and SSMH 3839 inside existing casing under I-5.
•Furnishing and installing approximately 660 linear feet total of two parallel 12-inch diameter fusible PVC (FPVC) water mains within existing steel casing under I-5 including restraint from existing casing to first joint.
•Furnishing and installing approximately 370 linear feet of 18-inch diameter FPVC sewer main within 24-inch diameter FPVC casing inside existing casing under I-5 and connections to existing 18-inch diameter concrete sewer main.
•Furnishing and installing approximately 350 linear feet of 24-inch diameter FPVC containment casing within existing steel casing under I-5.
•Installing City-furnished Schedule 40 PVC conduit (approximately 440 linear feet) in existing casing under I-5. Install two City-furnished precast concrete junction boxes on either side of I-5, along with City-furnished Schedule 40 PVC sweeps and conduit to connect the two junction boxes.
•The Contractor shall provide and install all water and sewer system materials including water and sewer mains, connections to the existing water and sewer system, fittings, valves, fire hydrants, water service materials and service reconnections, reconnect existing side sewer, and temporary sewer bypass system. Also included in the project is all traffic control, backfilling, paving and site restoration.

Project completion info: This project was completed in October of 2016.

 

____________________________________________________________________________

 

Project Name: Reservoir Seismic Retrofit for Washington Boulevard, American Lake Gardens, 104th and Bridgeport, Western State, Steilacoom Boulevard, Farwest, and Oakbrook

Job No.: 0607
Work Order No.: 21058
District Project Manager: Dave Hall
Engineer: RH2 Engineering, Inc.
Engineer’s Estimate: $740,000 including sales tax

Scope of Project: Furnishing and Installing seismic upgrades including: seismic adapters, anchor bolts and chairs, concrete ringwall foundations, concrete foundations, piping, structural, coatings, utility relocating, and site improvements for seven (7) water storage reservoirs. Project award will be based upon base bid. Schedule A, B and/or C will be optional based upon available funds.

Project completion info: This project was completed in October of 2016.

 

____________________________________________________________________________

 

Project Name: Veterans Drive R&R Project, Phase 4

Job No.: 0606
Work Order No.: 21054
District Project Manager: Craig Gibson
Engineer: BHC Consultants, LLC
Engineer’s Estimate: $680,000 including sales tax

Scope of Project: Furnishing and installing approximately 1,550 linear feet of 12-inch diameter and 1,610 linear feet of 8-inch diameter ductile iron pipe, fire hydrants, valves, appurtenances, replacement and reconnection of water services, connections to the existing water main, abandoning of existing asbestos cement water main, and pavement and landscape restoration. The Contractor shall provide and install all water system materials including water main, fittings, valves, fire hydrants and water service materials. This is different from previous District projects.

Project completion info: This project was completed in December of 2015.

 
___________________________________________________________________________

 

Project Name: Steilacoom Blvd SW Water Main – Replacement and Rehabilitation Project

Job No.: 0618
Work Order No.: 21108
District Project Manager: Craig Gibson
Engineer: RH2 Engineering, Inc.
Engineer’s Estimate: $779,000 including sales tax

Scope of Project: Furnishing and Installing approximately 3663 linear feet of 16-inch diameter, 138 linear feet of 12-inch, and 87 linear feet of 8 and 6-inch diameter ductile iron pipe, fire hydrants, valves, appurtenances, replacement and reconnection of water services, connections to the existing water main and restoration. The Contractor shall provide and install all water system materials including water main, fittings, valves, fire hydrants and water service materials. LWD will provide water meters.

Project completion info: This project was completed in April of 2015.
 
____________________________________________________________________________

 

Project Name: Wisteria 20-Inch Water Transmission Main Extension

Job No.: 0609
Work Order No.: 21064
District Project Manager: Craig Gibson
Engineer: Parametrix
Engineer’s Estimate: $350,000 including sales tax

Scope of Project: Furnishing and Installing approximately 1,115 linear feet of 20-inch-diameter DI pipe, fire hydrants, valves, appurtenances, connections to the existing water main and restoration. The Contractor shall provide and install all water system materials including water main, fittings, valves, and fire hydrants.

Project completion info: This project was completed in March of 2015.
 
__________________________________________________________________________

 

Project Name: 2014 Water Main Relocations at Sound Transit Rail Crossings

Job No.: 0509
Work Order No.: 20613
District Project Manager: Craig Gibson
Engineer: CHS Engineers
Engineer’s Estimate: $245,000 including sales tax

Scope of Project: Three water main replacements at three locations, each crossing the Sound Transit railroad corridor in the City of Lakewood. The first crossing occurs adjacent to or within Clover Creek Drive SW right of way. The second crossing occurs south of the first crossing, near the intersection of New York Avenue SW and Pacific Highway SW. The third crossing occurs further south, near the intersection of Glenwood Avenue SW and Pacific Highway SW. This is just north of the Sound Transit underpass at Pacific Highway SW. All three crossings shall be completed with jack and bore techniques under the railroad and each crossing includes connections to the existing water main on either side of the crossings.

Project completion info: This project was completed in March of 2015.
 
____________________________________________________________________________

 

Project Name: Bridgeport Way – 75th Street to 83rd Street and Flett Creek Crossing (1000’ in Custer Road)

Job No.: 0573
Work Order No.: 20888
District Project Manager: Craig Gibson
Engineer: RH2 (for Flett Creek Crossings only); Craig Gibson for the remainder of the water components of the project
Engineer’s Estimate: $800,000

Scope of Project:The City of Lakewood is continuing to rebuild Bridgeport Way. This Phase 3 City project involves replacement of about 4,000 lineal feet of old AC water mains with new 12-inch ductile iron water mains. The water system work will be designed primarily by LWD and included in the City’s construction contract.

Project completion info: This project was completed in February of 2015.
 
_____________________________________________________________________________

 
Project Name: Sylvan Park Water Main Replacement Program, Phase 1
Job No.: 0597
Work Order No.: 21008
District Project Manager: Craig Gibson
Engineer: Parametrix
Engineer’s Estimate: $903,480 including sales tax

Scope of Project:
Furnishing and Installing approximately 4,200 linear feet of 8- and 12-inch-diameter PVC pipe, fire hydrants, valves, appurtenances, replacement and reconnection of water services, connections to the existing water main and restoration. The Contractor shall provide and install all water system materials including water main, fittings, valves, fire hydrants and water service materials.

Project completion info: This project was completed in October of 2014.
 
__________________________________________________________________

 
Project Name: Lakeholme Road SW Water Main-Replacement & Rehabilitation Project

Job No.: 0598
Work Order No.: 21009
District Project Manager: Craig Gibson
Engineer: RH2 Engineers
Engineer’s Estimate: $381,000 including sales tax

Scope of Project:
This project will consist of the installation of approximately 2,350 linear feet of 8-inch diameter and 90 linear feet of 4-inch diameter ductile iron pipe, fire hydrants, valves, appurtenances, replacement and reconnection of water services, connections to the existing water main, and restoration. The contractor will provide all water system materials including water main, fittings, valves, fire hydrants, and water service materials.

Project Special Conditions: The District is going to take a current section of water main, take it out of service, and use it as a casing to slip in new water service pipe; this will save significant road restoration costs.

Project completion info: This project was completed in September of 2014.
 
__________________________________________________________________

 
Pine Street

Installation of approximately 73 linear feet of 12-inch diameter and 2,258 linear feet of 8-inch diameter ductile iron pipe, 4-inch diameter ductile iron pipe, 2-inch diameter HDPE, fire hydrants, valves, appurtenances, replacement and reconnection of water services, connections to the existing water main, and restoration. This work will effect the following streets: Pine Street, Langlow, Lakeland, and Walnut Streets
 
__________________________________________________________________

 
Veterans Drive—Lakeholme Road SW to Alameda Avenue SW

This project continues the 2012 project involving replacement of approximately 1700 lineal feet of old AC mains with new 12-inch and 8-inch ductile iron mains along Veterans Drive including new hydrants, valves, and replacement water services.
 
__________________________________________________________________

 
Lakeland Avenue—Veterans Drive South to the end

This proposed project starts penetrating the residential areas off the trunk main in Veterans Drive installed in 2011. Lakeland Avenue currently has approximately 1000 feet of 4-inch AC water main with a fire hydrant at the end. This project would replace the existing 1000 feet of 4-inch AC main and provide adequate fire protection and the replacement of the 19 services.

 
__________________________________________________________________

 

Lakeholme Road—Veterans Drive South 250 Feet

The second water main proposal to branch off the Veterans Drive trunk main to serve the residential area would be on Lakeholme Road, going south off Veterans Drive. This proposed 8-inch ductile iron main would replace the existing 4-inch AC main at least as far to the first fire hydrant, some 250 feet south of Veterans Drive. This would include the replacement of ten services and the one fire hydrant with provisions to extend the main in the future.